Footpath Upgrade for Low Head
07 Feb 2020
In the coming weeks George Town Council will be constructing a 2m wide coloured concrete path, that will extend from the large anchor situated at the entrance to the Pilot Station to the Penguin Tour facility. (a total length of 784 L/M). The construction of the pathway will occur between the hours of 7am to 4.30 pm unless otherwise advised..